10.05.2023: Partial network failure KG 3
Since yesterday afternoon, the network in KG 3 has been partially down. This has caused the network and telephony to fail. The reason is a fiber optic cable defect between KG 2 and KG 3. We are trying to have the damage repaired as quickly as possible.
Since yesterday afternoon, the network in KG 3 is partially down. As a result, the network and the VoIP phones no longer work. Affected are data sockets in KG 3 that start with 21. or 41. The outage is caused by the construction work in KG 2. The construction management has been informed and is trying to repair the damage as quickly as possible.